analyst workspace · RPJMN 2025–2029 (demo corpus)
Coherence workspace
last full pass · pass 4 of 4 · 9,412 pages
Provisional / pre-validation. Backtesting against RPJMN 2015–2019 → 2020–2024 has not been run. Every number on this screen is illustrative demo data.
draft under simulation
KRISNA irrigation / paddy-land retrodiction
A historical planning decision already known to have caused downstream problems, fed back into the system as if it were still an unsigned draft.
forecast cascade · probability of missing target
interval shown, never a bare point estimateIrrigation Network Rehabilitation
Public Works81% · CI 66%–91%
12-month horizonGP forecast + survival analogueSustainable Paddy Field Protection
Agriculture74% · CI 55%–88%
18-month horizonCausal model over coherence graphRural Water Access
Public Works49% · CI 30%–68%
24-month horizonABM cascade, 2,000 runsFood Price Stabilisation
Trade38% · CI 19%–60%
24-month horizonABM cascade, 2,000 runs
Cascade output is validated at pattern level — which programs are affected and roughly what magnitude — not exact numeric agreement.
retrodiction check
This scenario has a recorded historical outcome. Run the forecast first, then reveal it — that ordering is what makes the match checkable rather than asserted.
Forecast backtesting (train on RPJMN 2015–2019, test against 2020–2024) has not been run. Every hazard and interval above is illustrative demo data labelled provisional.